Home / ERP implementations / Metalworking
Lemonsoft · Metalworking

From Excel to a full ERP in metalworking

Production management moved from spreadsheets to an ERP. The system expanded to more production sites and to electronic order exchange.

Customer
Young manufacturing company making metal products. Later the business expanded to several production sites in different countries
ERP system
Lemonsoft

The situation

At first, orders and production were managed with spreadsheets. As order volumes and output grew, Excel no longer provided the control needed.

What was implemented

Rollout began with the basic production core:

  • product catalogue;
  • production orders;
  • product specifications;
  • management of production operations.

Functionality was then extended:

  • accounting;
  • management reporting;
  • quality control;
  • registration of complaints and deviations;
  • electronic order exchange (EDI).

The system gradually spread to other production sites. During the transition, the old and new systems ran in parallel for some time.

Result

  • Production is no longer managed through Excel.
  • Repetitive operations are automated.
  • Production accounting is more transparent.
  • The system can be scaled to new production sites.
  • Routine work has been reduced. The working time saved is significant.
A project carried out by AITEHO. The customer name and identifying details have been removed.

All ERP implementations